top of page
Past Projects

San Mateo Replacement Parking Track
SSC provided construction inspection and engineering support services for the San Mateo Replacement Parking Track project. The project covered construction and integration of a new #10 mainline turnout and 1100’ of new track off the Peninsula Subdivision’s Main Track Two as well as #8 dual switch point derail, 80’ of paneled access track for hi-rail and rail bound equipment access, 2100’ of engineered maintenance road, and two CIDH pile supported CMU sound walls totaling 1000’+, 20’ of split culvert installation, solar controlled irrigation system, and site securement via security/ privacy fencing installation.

Hayward Maintenance Project Phase 2
The Hayward Maintenance Project Phase 2 (HMC2) East Storage Yard (ESY) Project serves as the fourth project under the Core Capacity Program. The Project will expand storage and dispatching capacity at the Hayward Maintenance Complex through the development of a new storage yard located east of the existing HMC.

Transbay Corridor Core Capacity Program Communication Based Train Control
The BART Train Control Modernization Program (TCMP) is a $1.14 billion investment to replace the existing train control system with a new communication-based train control (CBTC) system and associated train control power cables and interlock cables, allowing BART to achieve the shorter headways needed to operate 30 regularly scheduled trains per hour on the trunk line between Daly City and the Oakland Wye.

State of California DOT - Caltrans District 10 – Multiple Projects
SSC provided Resident Engineers and Construction Inspectors responsible for overseeing multiple concurrent contracts valued at several million dollars, spanning the areas of roadway barrier replacement, pavement works, culvert replacement, and signage updates.
